DESCRIZIONE
 
Dekleva Gregoric Metal recycling plant PivkaWhat is long-lasting and what is recycle friendly was one of the key questions we were able to follow in the project for a metal recycle plant, where they first accumulate and then separate different waste metals and prepare them for reuse. The project consists of an immense production plateau and two small buildings on the edge of it.

Dekleva Gregoric Metal recycling plant PivkaWe clearly divided the generic base, flexible for multiple-use and the very specific, non-flexible, therefore ephemeral and recycle friendly by its activity. In these terms the huge concrete plateau with a definition wall and attached concrete service building define the core of the current production, however they easily allow for change of program within the industrial zone. This huge part of the project required careful placing of the plateau in the environment ensuring least earth works and lowest possible concrete wall.

On the other hand, the small 100% metal office building works as a very specific control deck supervising the weighing of the incoming waste and out-coming metals. Since this specificity means non-adaptability we had to allow for easy and clear on-site recycling when this building is not needed anymore.

In contrast to the very rough production that goes on at the site we have embedded some abstract or we like to think “poetic” content in the project. The two buildings are of the same volume, but materially very different: one is made entirely out of concrete, whereas the other is all steel – from structure to cladding. Thus the two buildings speak about the context of material separation process of the metal recycle plant.
Top
LOCALIZZAZIONE
 
Continente
Europa
Nazione
Slovenia [Slovenija]
Regione
Notranjsko-kraška
Città
Pivka
Località
Neverke
Indirizzo
Snežniška cesta
 
 
Top
MAPPA
 
 
Top
TIPOLOGIA
 
ARCHITETTURA
Edifici e impianti industriali
Officine, centri di lavorazione e manutenzione
Top
CRONOLOGIA
 
Progetto
2005 - 2007    
Realizzazione
2007 - 2008
Top
PREMI
 
2009
Golden Pencil
ZAPS
2009
International Architecture Awards
The Chicago Athenaeum
2008
Plecnik's Medal
Top
RIFERIMENTI BIBLIOGRAFICI
 
 
"Metal recycling plant. Pivka, Slovenia. Dekleva Gregoric Arhitekti", A+U. Architecture and Urbanism, 3/2009, march 2009 [Architecture in Croatia and Slovenia], pp. 114-117
Tomaz Brate, "Context in the 21st century?", Oris 51, june 2008
Top
COMMITTENTE
 
 
Andrej Dolenc, Odpad d.o.o. Pivka
Top
STAFF
 
Progetto
Dekleva Gregorič arhitekti, Projektiranje d.o.o.
Gruppo di progettazione
Aljoša Dekleva, Tina Gregorič, Lea Kovic
Top
CREDITS
 
 
Photos © Miran Kambič
Drawings © Dekleva Gregorič arhitekti
Text edited by Dekleva Gregorič arhitekti
Courtesy by Dekleva Gregorič arhitekti

 Dekleva Gregorič arhitekti Metal Recycling Plant ODPAD Pivka Slovenia



se non avete già cliccato sulla striscia fotografica all'inizio della scheda, accedete ora alla galleria delle foto [16 immagini] e dei disegni [10 immagini]
 
 
Contacts    Copyright © 2004 - 2024 MONOSTUDIO | ARCHITECTOUR.NET
 
| Disclaimer | Condizioni d'utilizzo | Credits |
 
       
?>