Username Password  
  Password dimenticata?  
ItalianoEnglish
 
  COME VEDERE L'ARCHITETTURA CONTEMPORANEA HOW TO SEE CONTEMPORARY ARCHITECTURE
COME VEDERE L'ARCHITETTURA CONTEMPORANEA HOW TO SEE CONTEMPORARY ARCHITECTURE
HOME
AUTORE | LOCALIZZAZIONE | TIPOLOGIA | MOSTRE | RICERCA AVANZATA

OPERA
 
 
Stazione Alta Velocità Torino Porta Susa
Top
PROGETTISTA
 
 
AREP | Silvio D'Ascia | Agostino Magnaghi
Top
CONTESTO
 
Rapporto con il luogo
AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationWork on Torino Porta Susa railway station, the first Italian station on the high speed Paris-Rome line, resumed at the end of 2009. The gateway into Italy from northern Europe, Torino Porta Susa is designed as an urban locus, an extension of the city’s existing Roman layout and public spaces, offering a wide range of transport and services. The station is an extensive hub where travellers can change easily from one mode of transport – high speed train, regional train, metro, bus, tram, car or two-wheeled vehicle – to another. It is also a centre of services and shops for commuters and local residents.
Top
DESCRIZIONE
 
Concept
AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationLocated between the Spina (the long boulevard crossing Turin from north to south on the site of former railway lines) and the Corso Bolzano, the station is in the form of a long gallery. It is covered by an imposing glass canopy, 385 metres long and 30 metres wide, which is joined perpendicularly at 100-metre intervals by walkways positioned in line with existing streets.

AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationVisitors enter the gallery at these points through large vertical openings in the glass gallery, each protected by a wide canopy. Inside the gallery is a series of volumes in steel and glass, housing services and shops. They rest on a two-level concrete base occupied by car parks and technical areas.
The City enters the Station
AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationA real street in itself, the covered gallery is bounded to the south by a public amenity tower and to the north by a sloping esplanade linking it to the historic city and the old station (which comprised only a passenger hall). Despite the differences in ground level from north to south and between the Corso Bolzano and the Spina, travellers using the new station move easily and smoothly between the five levels, by means of a gently sloping ramp, escalators, staircases and lifts.

- Four calvalconi walkways (in blue, at 100-metre intervals) connect the passenger concourse (level -1) and the platforms below (level -3).
- Five walkways (in red) allow visitors to cross the gallery from east to west.
An Urban Gallery
AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationBoth an intermodal terminal and an urban locus, Torino Porta Susa station is a highly innovative project in the world of rail transport. It integrates all the requirements of an interchange hub in a new and resolutely contemporary city space: the city enters the station and the station becomes a piece of the city.

AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationIt can also be seen as a continuation of the urban style of Italy’s great 19th-century city arcades (Galleria San Federico in Turin, Galleria Umberto I in Naples, Galleria Vittorio Emanuele II in Milan), and of the great concourses of Europe’s 19th-century railway stations.
.
AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa Station
Top
ECOSOSTENIBILITA'
 
AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationThe skin of the glass roof (15,000 square metres) is entirely covered in single-crystal photovoltaic sensors positioned between the two layers of glass. They also act as shading devices, optimizing the comfort of people using this public space in summer and winter alike. Energy production is 680,000 kWh per year. The whole volume is ventilated naturally – from the platforms, which have high inertia, to the main hall, which is more open to the exterior.

AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa StationThe station is temperature-controlled in winter and summer.

Abundant vegetation in the station’s interior spaces provides additional shade and a sensation of coolness.
Top
LOCALIZZAZIONE
 
Continente
Europa
Nazione
Italia
Regione
Piemonte
Provincia
Torino
Città
Torino
Indirizzo
Piazza Statuto, Corso Inghilterra, Corso Bolzano (Porta Susa)
 
 
Top
MAPPA
 
 
Top
TIPOLOGIA
 
Principale
ARCHITETTURA
Edifici e strutture per i trasporti
Stazioni ferroviarie

URBANISTICA E PROGETTAZIONE URBANA
Infrastrutture di trasporto e viabilità
Poli d'interscambio
Accessoria
ARCHITETTURA
Edifici commerciali
Negozi
Arredo urbano e strutture per spazi pubblici
Strade e piazze
Top
CRONOLOGIA
 
Progetto
2001 - 2002     Progetto vincitore di concorso
Realizzazione
2006 - 2013
Top
PREMI
 
2013
European Steel Design Award
2013
Large Rail Station of the Year
European Rail Awards
2012
Eurosolar Award
Top
RIFERIMENTI BIBLIOGRAFICI
 
 
David Cohn, "Porta Susa high-speed train station, Turin, Italy", Architectural Record 8/2014, august 2014 [Transportation], pp. 109-113
Margot Guislain, "Nouvelles gares en Europe / New rail stations n Europe", Moniteur Architecture AMC 214, avril/april 2012, pp. 65-75
"Porta Susa, Turin", Moniteur Architecture AMC 214, avril/april 2012, p. 69 (65-75)
"Gare de Turin, Porta Susa, Italie / Porta Susa Station, Turin", Architecture Mediterraneenne 59, juin/june 2009, pp. 74-76
Eleonora Capelli, "L'Europa va in carrozza / Europe by Train", Ottagono 167, febbraio/february 2004, pp. 78-79 (70-87)
Filippo De Pieri, "L'alta velocità avanti piano", Il giornale dell'architettura 14, gennaio 2004, "Inchieste" p. 3 (3-5)
"La nuova stagione delle stazioni ferroviarie", Il giornale dell'architettura 14, gennaio 2004, "Inchieste" p. 3 (3-5)
Il nodo urbano / The Urban Link, supplemento a/supplement of l'Arca 187, dicembre/december 2003
"Nuova Stazione Porta Susa di Torino", Casabella 715, ottobre/october 2003, "Architettura_e tecnologie per le grandi stazioni"
Michele Bazan Giordano, "Torino dinamica / Porta Susa Station", L'Arca 172, luglio-agosto/july-august 2002, pp. 22-25
Top
COMMITTENTE
 
 
RFI Rete Ferroviaria Italiana spa
TAV (Treno Alta Velocità spa)
Top
IMPORTO
 
 
€ 79,000,000
Top
DATI
DIMENSIONALI
 
Lunghezza
galleria ml. 385
Superficie
mq. 47.500
Top
STRUTTURISTA
 
 
OTH
Top
STAFF
 
Progetto
AREP
Jean-Marie Duthilleul, Étienne Tricaud
Coprogettisti
Silvio D'Ascia, Agostino Magnaghi
Gruppo di progettazione
B. Banwarth, S. Barracco, M. Boenders, R. Camarda, M. Camassi, M. Chazelle, P. Coppola, A. Coullez, A. Delarbre, D. Dorell, E. Dussiot, F. Ferrara, S. Genco, P. Holstein, A. Joineau, L. Lafourcade, L. Neouze, F. Levêque, J. Lomessy, I. Magnaghi, T. Manco, M. Massault, L. Moschella, S. Murr, M. Pihouée, M. Rubino, A. Ruiz Gomez, A. Rocca, E. Vigliocco
Coordinamento
Ing. C. La Montagna
Consulente strutturale
SI.ME.TE. – Ing. C. Piantino (strutture in cemento armato)
MAP 3 (strutture metalliche)
Impianti idraulici
Ing. Gianfranco Sillitti
Impianti elettrici
Syspro Engineering
Direzione lavori
F. Nicolosi, E. Seif, A. Milano, S. Aureli, G. Perino
Silvio D'Ascia Architecture
Prevenzione incendi
Ing. G. Amaro
Computo metrico
Arch. G. Aragona
Top
CREDITS
 
 
Photos © AREP, Agostino Magnaghi, Giovanni Fontana & Paolo Bartone
Drawings © AREP
Text edited by AREP
Courtesy of AREP, Arch. Agostino Magnaghi

AREP Silvio D'Ascia Agostino Magnaghi Torino Porta Susa Station



se non avete già cliccato sulla striscia fotografica all'inizio della scheda, accedete ora alla galleria delle foto [27 immagini] e dei disegni [11 immagini]
 
 
Contacts    Copyright © 2004 - 2024 MONOSTUDIO | ARCHITECTOUR.NET
 
| Disclaimer | Condizioni d'utilizzo | Credits |
 
       
?>